Plinth Work

The main function of Plinth is to distribute the load of columns to foundation. After Below column and footing work, Plinth beams are made with reinforcement and concrete. It is RCC structure constructed between foundation and wall of the structure. Soil Filling to be done in between the space of plinth beams.After proper compaction and soil settlement Soaling work is carried out. Side shuttering to be done for PCC work. At the final stage Finish surface pcc work to be done. Generally PCC work is done with grade M 15. Curing of the work gives strenth to PCC work