Storm water drainage system network is important to avoid accumulation of water at one particular area. Water logging is the problem in many places so during development of any Amenity area, Garden area, Villa or Building we need to make provision of drainage system so that water may easily pass through it. Slope to be maintained properly towards drain so that the water will go directly to the drain.
Construction of smaller drain in Garden,School amenities or Society premises area can be done by conventional method.
1. Excavation of ground considering the slope of the drain
2. PCC of the drain
3. Brickwork or Side wall shuttering and pouring of Specified grade concrete in it.
4. Plaster work
5. Curing of brick work & Plaster
6. Placement of RCC covers/ Ms fabrication covers over it.
7. After specified distance chamber work with cover on it
Waste water disposal in Resorts, Offices, Camp house is mostly done with RCC septic tank system. It is easy to install.Cost effective and durable.
As it is heavy in weight it require Hydra for its placement. According to specifications and requirement of user different capacity tanks are available in market. One or two days time will require to complete the entire work.
Methodology involves,
1. Excavation of the ground according to size of tank
2. Placement of tank in excavated portion
3. Soak pit construction with Brickwork & plaster
4. Plumbing Inlet and outlet connections
5. Chamber cover placement of soak pit
Irrigation system for Gardens mainly designed to give water for plantation. The main things which will needed are Sintex tank, PVC Pipes and fittings, Valve, Pressure pump to make system operational. Base foundation work to be done for sintex tank as it is water storage tank then this needs to be place at some height. If tank placement is done at specific height then there is very less need of pressure pump. Without the use of pressure pump water can pass through pipes. PVC pipe inlet and outlet connections to be done at tank level. From outlet, PVC pipe laying can start. Valve to be provided as per necessity. We can place valve after 20 feet distance as per standards.